Sidewalk bridge systems are a common sidewalk scaffolding system. The sidewalk bridge system consists of sidewalk bridge leg, guard rail, scaffolding wide flange beam and galvanized corrugated sheet, providing convenience for pedestrians.
MaterialsQ235 steel
SpecificationItem No. | Description | Weight (KGS) | Weight (LBS) | Package Unit (Pcs) |
BL8 | 8' Bridge Leg 4mm wall thickness | 26.47 | 58.31 | 1000 |
BL10 | 10' Bridge Leg 4mm wall thickness | 31.58 | 69.56 | 1000 |
BL12 | 12' Bridge Leg 4mm wall thickness | 36.79 | 81.03 | 1000 |
BL14 | 14' Bridge Leg 4mm wall thickness | 41.99 | 92.49 | 1000 |
BL16 | 16' Bridge Leg 4mm wall thickness | 47.1 | 103.74 | 1000 |
BL20 | 20' Bridge Leg 4mm wall thickness | 57.41 | 126.45 | 1000 |
If you are interested in our products, we would like to inform you in details personally, via an e-mail, so do not hesitate to contact us.
If you are still struggling to identify suitable products for your project, please Contact Us to configure the most suitable Sidewalk Bridge System for you.
CORONET SCAFFOLD
Coronet Group Suzhou Co.,Ltd.
CN: 5 Xinghan St., Suzhou, Jiangsu, Province
Tel.: +86-512-85557000 (CN)
USA: 26517 Highway 74 Perris CA 92570
Tel.: +1-866-300-6688Jim Fraser
343 Phosphor Ave, Metairie LA. 70005.
+1-504-432-1124 Jose Chaumont
4740 Ingersoll St, Suite 102Houston TX 77027
Spain: C/ Hierro, 26. P.I. Aimayr, 28330 San Martín de la Vega, Madrid
+34 910 216 999 Carlos Cano
E-mail:
coronet@coronet-scaffold.com