Snap-on cross braces are used to connect 2 scaffolding frames. The cross bars are electro galvanized for corrosion resistance.
MaterialsQ235 steel
ParametersItem No | Description | Weight (Kgs) | Weight (LBS) | Package Unit (Pcs) |
CB0532S | 5'x32" Snap-on Cross Brace | 4.45 | 9.8 | 1000 |
CB0548S | 5'x48" Snap-on Cross Brace | 4.95 | 10.9 | 1000 |
CB0724S | 7'x24" Snap-on Cross Brace | 5.61 | 12.35 | 1000 |
CB0732S | 7×32" Snap-on Cross Brace | 5.65 | 12.45 | 1000 |
CB0748S | 7'x48" Snap-on Cross Brace | 6.02 | 13.25 | 1000 |
CB0848S | 8'x48" Snap-on Cross Brace | 6.61 | 14.55 | 1000 |
CS1024S | 10'x24" Snap-on Cross Brace | 7.5 | 16.52 | 1000 |
CS1032S | 10'x32" Snap-on Cross Brace | 7.51 | 16.55 | 1000 |
CS1048S | 10'x48" Snap-on Cross Brace | 7.79 | 17.16 | 1000 |
If you are interested in our products, we would like to inform you in details personally, via an e-mail, so do not hesitate to contact us.
Our frame scaffolding system fully comply with ANSI/SSFI SC100-5/05 standards.
If you are still struggling to identify suitable products for your project, please Contact Us to configure the most suitable Scaffolding Frame System for you.
CORONET SCAFFOLD
Coronet Group Suzhou Co.,Ltd.
CN: 5 Xinghan St., Suzhou, Jiangsu, Province
Tel.: +86-512-85557000 (CN)
USA: 26517 Highway 74 Perris CA 92570
Tel.: +1-866-300-6688Jim Fraser
343 Phosphor Ave, Metairie LA. 70005.
+1-504-432-1124 Jose Chaumont
4740 Ingersoll St, Suite 102Houston TX 77027
Spain: C/ Hierro, 26. P.I. Aimayr, 28330 San Martín de la Vega, Madrid
+34 910 216 999 Carlos Cano
E-mail:
coronet@coronet-scaffold.com